Utilized heavy excavators to deepen the Comoro riverbed to prevent wet season flooding in adjacent urban zones.
Works undertaken
- Sediment removal along the designated river reach
- Bank reprofiling to improve channel capacity
- Disposal and reuse of extracted material
- Post-works survey of channel depth
This is placeholder text. Replace it with the full project report.