Comoro River Dredging

Utilized heavy excavators to deepen the Comoro riverbed to prevent wet season flooding in adjacent urban zones.

Works undertaken

  • Sediment removal along the designated river reach
  • Bank reprofiling to improve channel capacity
  • Disposal and reuse of extracted material
  • Post-works survey of channel depth

This is placeholder text. Replace it with the full project report.

← Back to all publications